How to Calculate OEE: Formula, Example and Calculator
OEE shows in a single percentage how much of the planned time a machine or a station really spent making good product. Below you will find the formula, a worked example and a calculator you can try with your own numbers.
6 min readUpdated 19 November 2026
What is OEE?
OEE stands for Overall Equipment Effectiveness. It answers three questions at once: did the equipment run for as long as planned, did it run at the speed it should, and how much of what it made was good?
OEE is the product of the three. The number itself matters less than which component is low: it tells you whether the loss comes from stops, from slow running or from defects.
The OEE formula
OEE = Availability × Performance × Quality
| Component | Formula | The loss it shows |
|---|---|---|
| Availability | Run time ÷ Planned production time | Breakdowns, setup and waiting |
| Performance | (Ideal cycle time × Total count) ÷ Run time | Slow running and small stops |
| Quality | Good count ÷ Total count | Scrap and rework |
Planned production time is the shift minus planned breaks and planned maintenance. Run time is what remains after unplanned stops are taken off as well.
OEE calculator
Enter the numbers of your own shift; the result updates as you type. The values it opens with belong to the example below.
OEE
76.2%
- Availability
- 90%
- Performance
- 86.4%
- Quality
- 98%
Run time: 405 minutes
Worked example
An assembly station takes 30 minutes of planned breaks in a 480-minute shift, so planned production time is 450 minutes. During the shift there are 45 minutes of unplanned stops, 700 units are made and 14 of them are defective. The ideal cycle time is 30 seconds.
| Component | Calculation | Result |
|---|---|---|
| Run time | 450 − 45 | 405 minutes |
| Availability | 405 ÷ 450 | 90.0% |
| Performance | (30 s × 700) ÷ (405 min × 60) | 86.4% |
| Quality | (700 − 14) ÷ 700 | 98.0% |
| OEE | 0.900 × 0.864 × 0.980 | 76.2% |
None of the components looks bad by itself, yet their product says that about a quarter of the planned time was lost. Performance is the lowest, so slow running and small stops are the first place to look.
What is a good OEE?
85% is often quoted as “world class”; it comes from assuming 90% availability, 95% performance and 99% quality. In many plants the first measurement comes out well below that, and that is normal.
Rather than comparing yourself with other plants, watch your own trend: is the OEE of the same line rising week by week, and which component is falling behind?
The six big losses
The losses that pull OEE down fall under six headings; each one counts against one component.
| Loss | Component it hits | Example |
|---|---|---|
| Breakdowns | Availability | Machine failure, waiting for material |
| Setup and changeover | Availability | Changing a die or a fixture |
| Small stops | Performance | A jammed part, short waits |
| Reduced speed | Performance | Running below the ideal cycle |
| Process defects | Quality | Scrap, rework |
| Startup losses | Quality | Defective units made while starting up |
Common mistakes in the calculation
- Counting planned breaks as downtime. Planned breaks and maintenance come off the planned production time; they do not touch availability.
- Choosing a loose ideal cycle time. If performance goes above 100%, the target time is longer than what can really be reached.
- Counting reworked units as good. Quality is calculated with units that were good the first time.
- Collecting the data by hand at the end of the shift. Stops recalled from memory go missing and times get rounded, so OEE looks better than it is.
OEE in manual assembly
OEE was born for machines, but it is used at manual assembly stations too; there the “equipment” is the station itself. The hard part is not the arithmetic but the data: how long a stop lasted, what caused it, and how many units were rejected and why usually go unrecorded.
Frequently asked questions
Can OEE be above 100%?
A correctly defined OEE never exceeds 100%. If performance comes out above 100%, the ideal cycle time was set longer than what can really be reached; update it.
What is the difference between OEE and TEEP?
OEE is based on planned production time. TEEP is based on all calendar time (24 hours, 7 days) and shows how much of the plant is used.
How often should OEE be measured?
Measuring per shift or per day and watching the weekly trend is common practice. What matters is not one shift's value but the direction over the weeks.