How to Calculate OEE: Formula, Example and Calculator

OEE shows in a single percentage how much of the planned time a machine or a station really spent making good product. Below you will find the formula, a worked example and a calculator you can try with your own numbers.

6 min readUpdated 19 November 2026

What is OEE?

OEE stands for Overall Equipment Effectiveness. It answers three questions at once: did the equipment run for as long as planned, did it run at the speed it should, and how much of what it made was good?

OEE is the product of the three. The number itself matters less than which component is low: it tells you whether the loss comes from stops, from slow running or from defects.

The OEE formula

OEE = Availability × Performance × Quality

ComponentFormulaThe loss it shows
AvailabilityRun time ÷ Planned production timeBreakdowns, setup and waiting
Performance(Ideal cycle time × Total count) ÷ Run timeSlow running and small stops
QualityGood count ÷ Total countScrap and rework

Planned production time is the shift minus planned breaks and planned maintenance. Run time is what remains after unplanned stops are taken off as well.

OEE calculator

Enter the numbers of your own shift; the result updates as you type. The values it opens with belong to the example below.

OEE

76.2%

Availability
90%
Performance
86.4%
Quality
98%

Run time: 405 minutes

Worked example

An assembly station takes 30 minutes of planned breaks in a 480-minute shift, so planned production time is 450 minutes. During the shift there are 45 minutes of unplanned stops, 700 units are made and 14 of them are defective. The ideal cycle time is 30 seconds.

ComponentCalculationResult
Run time450 − 45405 minutes
Availability405 ÷ 45090.0%
Performance(30 s × 700) ÷ (405 min × 60)86.4%
Quality(700 − 14) ÷ 70098.0%
OEE0.900 × 0.864 × 0.98076.2%

None of the components looks bad by itself, yet their product says that about a quarter of the planned time was lost. Performance is the lowest, so slow running and small stops are the first place to look.

What is a good OEE?

85% is often quoted as “world class”; it comes from assuming 90% availability, 95% performance and 99% quality. In many plants the first measurement comes out well below that, and that is normal.

Rather than comparing yourself with other plants, watch your own trend: is the OEE of the same line rising week by week, and which component is falling behind?

The six big losses

The losses that pull OEE down fall under six headings; each one counts against one component.

LossComponent it hitsExample
BreakdownsAvailabilityMachine failure, waiting for material
Setup and changeoverAvailabilityChanging a die or a fixture
Small stopsPerformanceA jammed part, short waits
Reduced speedPerformanceRunning below the ideal cycle
Process defectsQualityScrap, rework
Startup lossesQualityDefective units made while starting up

Common mistakes in the calculation

OEE in manual assembly

OEE was born for machines, but it is used at manual assembly stations too; there the “equipment” is the station itself. The hard part is not the arithmetic but the data: how long a stop lasted, what caused it, and how many units were rejected and why usually go unrecorded.

With Deskval Workbench that data comes into being as the work is done: job times, stop and reject reasons, good and defective counts are recorded by themselves, with no forms to fill in. See Workbench

Frequently asked questions

Can OEE be above 100%?

A correctly defined OEE never exceeds 100%. If performance comes out above 100%, the ideal cycle time was set longer than what can really be reached; update it.

What is the difference between OEE and TEEP?

OEE is based on planned production time. TEEP is based on all calendar time (24 hours, 7 days) and shows how much of the plant is used.

How often should OEE be measured?

Measuring per shift or per day and watching the weekly trend is common practice. What matters is not one shift's value but the direction over the weeks.